A garden designed in Duimstok seen from the corner by the house: in front a sunken patio of grey tiles 45 cm below the lawn behind a concrete block wall, with a garden sofa and a fire pit, steps down from the house side, and at the back right a bed raised 60 cm behind timber sleepers, planted with box balls and a small tree.

Notes from the studio

Cut and fill: keep the soil from a sunken patio on site

The third skip

The digger has been on site for a morning, the sunken patio is out, and the skip is full. So is the second one. The client asks what the third lorry is for, and you hear yourself explain that soil takes up more room in a skip than it did in the ground.

Soil you dig out costs you twice: once to dig, and once to cart away. On a garden with a sunken patio and a raised bed, it does not have to leave at all. The soil from the hole fills the bed. That is cut and fill, and it is worth working out at the design stage, while you can still change the height of the bed to match the depth of the patio.

What comes out of a sunken patio

Take the garden in the pictures: a sunken patio 4.0 by 2.5 m inside its walls, 45 cm below the lawn, behind a concrete block wall.

  • The floor: 4.0 × 2.5 × 0.45 = 4.50 m³.
  • The wall: it stands outside the patio, in the lawn round it, and a block wall is 20 cm thick. So the hole is 4.4 × 2.9 m at the top. The ring for the wall is 12.76 − 10.00 = 2.76 m², and 45 cm deep that is another 1.24 m³.

That is 5.74 m³ out of the ground before you start on the build-up under the paving. Your own sub-base and bedding come on top of that: if they are 20 cm deep, digging them out of the 10 m² floor is a further 2.0 m³, and the footing under the wall is more again.

The garden from above at an angle with the sunken level selected, the bar reading Level, minus 45.0 cm, a menu set to Concrete block, a height box with minus 45 in centimetres, and the buttons Steps and Remove.
The sunken patio selected from above: 45 cm down, a concrete block wall, steps on the house side.

What a raised bed takes

At the back of the same garden is a bed raised 60 cm behind timber sleepers: 3.65 by 2.90 m on its outline. A raised level's wall stands inside its outline, and a sleeper on edge is 10 cm deep, so the soil sits in 3.45 × 2.70 = 9.32 m². Sixty centimetres deep, that is 5.59 m³.

So 5.74 m³ comes out of the patio and 5.59 m³ goes into the bed. On paper the soil never leaves the garden. The heights were chosen for that: at 40 cm the same bed would take 3.73 m³ and leave you with two cubic metres to cart away.

Standing on the lawn beside a bed raised 60 cm behind timber sleepers, with four sleeper steps up on the right, bark mulch on top, two box balls, a planter with grasses and a small tree against a slatted fence.
The raised bed at the back: 60 cm of sleepers, four steps up, and 9.3 m² of bark mulch on top.

Check the figures in the design

In Duimstok both are levels: you draw an outline on the plan, type its height in centimetres, a minus sign for down, and choose its retaining wall. The wall is built where it really goes, outside a sunken level and inside a raised one, so the areas you read off the design are the areas you will dig and fill.

Two readings confirm the arithmetic. Fill the raised bed with bark mulch and select it: 9.30 m², the 9.32 m² inside the sleepers less a millimetre at each edge. Fill the sunken patio with tiles: 9.29 m², because the steps down take 0.7 m² of the floor. The app measures areas; the cubic metres are your multiplication, from numbers you can trust.

The garden from above at an angle with the patio tiles selected in the sunken patio, the bar reading Patio Tile Grezzo and 9.29 square metres.
The tiles in the sunken patio: 9.29 m², the floor less its steps.

What the numbers leave out

  • Bulking. Dug soil takes up roughly a quarter to a third more room than it did in the ground, so the heap is bigger than 5.7 m³. It goes back into the bed in layers, firmed as it goes, and settles over the first winter. Top the bed up then rather than overfilling it now.
  • Topsoil and subsoil. The top layer of a lawn is the good soil. Strip it first and keep it apart; the subsoil from deeper down goes into the bottom of the raised bed, and the topsoil goes back on top where the plants are.
  • Under paving, not soil. Soil is fine under planting. A raised terrace that will carry paving needs a proper sub-base, so it takes much less of your spoil.
  • Drainage. A sunken patio needs a drain or a soakaway. Duimstok does not model water.

Show the client why the bed is 60 cm

A client will push back on a raised bed they did not ask for, until they walk through the design: down into the patio, across the lawn and up onto the bed. Then tell them the bed is where the patio went, and what it saves in skips.

The garden from above at an angle with the raised level selected, the bar reading Level, 60.0 cm, a menu set to Timber sleeper, a height box with 60, and the buttons Steps and Remove.
The raised bed selected: 60 cm, a timber sleeper wall. Type 40 and the steps and the wall follow.

Try it

  1. Open the plan of the garden and press O for the view from above.
  2. Press Level on the toolbar, type -45 in the height box and drag out the patio. Select it, press Steps and click the side that faces the house.
  3. Press Level again, type 60, and drag out the bed. Select it and choose Timber sleeper for its wall; press Steps and click a side.
  4. Open Catalog, pick a patio tile, choose Fill and click inside the patio. Do the same with bark mulch on the bed. Select each to read its square metres on the bar.
  5. Multiply by the depth. If cut and fill do not match, change the bed's height and read again.

Questions people ask

How much soil comes out of a sunken patio?

The floor area times the depth, plus the trench for the wall around it and your build-up. A 4 × 2.5 m patio 45 cm deep with a 20 cm block wall round it is 5.74 m³ before the sub-base.

What can I do with the soil from digging a patio?

Use it on site: fill a raised bed, build a gentle bank, or level the lawn. Keep the topsoil apart, put the subsoil underneath, and compact it in layers.

How much more room does dug soil take?

Roughly a quarter to a third more than it did in the ground, depending on the soil. Plan skips on the loose volume, not the hole.

Does Duimstok calculate soil volumes?

Not yet. It measures the areas of every level and covering exactly, with each retaining wall where it really stands, and you multiply by the height you typed.