The client bought an 8 by 6 ft shed and asked for a slab base "a bit bigger than the shed". Someone wrote 2.20 × 2.75 m on the job sheet, which looks generous and sensible. On site it means a row of narrow cuts along one side and another along one end, a saw and a dust mask for half an hour, and a pallet with more slabs on it than the area said, because every cut piece starts as a whole one.

Twenty centimetres off one side and twenty-five off the other would have made all of that go away. A shed base is one of the few pieces of paving where you get to choose the size freely, so choose it to fit the slab. Here is the arithmetic, worked out with Plan tiles in Duimstok, which counts whole and cut pieces for every layout before anything is laid.

The shed: 1.87 × 2.43 m on the ground

The example is the catalogue's Garden Shed, a 6 × 8 ft apex shed in timber with a felt roof. Its walls are 1.83 × 2.39 m and stand on a timber base 2 cm wider all round, 1.87 × 2.43 m. The eaves are at 1.85 m, the ridge at 2.2 m, and the roof overhangs the walls by 8 cm all round. It goes in the back corner of a garden 9.1 × 4.8 m, 50 cm from both fences.

Two slabs are tried, both from the catalogue: Concrete Tile 50×50 Grey and Bluestone 60×60. And two base sizes for each: one sized to the shed, one sized to the slab.

50 cm tiles: 30 pieces or 20

Sized to the shed, with roughly 18 cm all round, the base is 2.20 × 2.75 m, 6.05 m². By area that is 24.2 tiles. Select the covering, press Plan tiles, and Duimstok lists the layouts with what each really takes. Laid square, stack bond: 20 whole tiles and 10 cut, the smallest piece 20 cm. In half bond: 18 whole and 12 cut. Either way you lay 30 pieces, not 24, and each cut piece starts as a whole tile from the pallet.

Sized to the slab, the base is 2.00 × 2.50 m, 5.00 m²: four tiles by five. Plan tiles reads 20 whole tiles, none cut. The shed's timber base still has 6.5 cm to spare on each side and 3.5 cm at each end. Along both eaves the roof's 8 cm overhang ends right at the edge of the tiles, so the drip lands on the outer row; at the gable ends the roof reaches 2.5 cm past them.

Two Plan tiles panels for Concrete Tile 50×50 Grey, each beside its base seen from above. Left, a base of 6.05 m²: half bond 18 whole tiles and 12 cut, stack bond 20 whole and 10 cut, the smallest 20.0 cm, and the diagonal layouts with 20 to 25 cuts. Right, a base of 5.00 m²: stack bond 20 whole tiles, none cut; half bond 18 whole and 4 cut.
Left: 2.20 × 2.75 m, 30 pieces with 10 or 12 cuts. Right: 2.00 × 2.50 m, 20 tiles and no saw.

Ten tiles fewer, ten cuts fewer, and a base that is still bigger than the shed.

60 cm bluestone: the bigger base takes no extra slabs

With 60 cm slabs the sum turns round, which is why it is worth doing every time rather than remembering a rule. On the same 2.20 × 2.75 m base, Bluestone 60×60 in stack bond is 12 whole slabs and 8 cut, the smallest piece 35 cm: 20 slabs off the pallet. In half bond along the long edge it is 12 whole and 10 cut, with a piece of 5 cm somewhere in it.

Now size it to the slab the other way, up instead of down: 2.40 × 3.00 m, four slabs by five, 7.20 m². Plan tiles reads 20 whole slabs, none cut. The same 20 slabs as the smaller base, no cuts, and 26.5 cm of paving beside the shed's timber base on each side and 28.5 cm at each end: room to step round it and to stand a wheelbarrow at the door. The area is bigger, 7.20 m² against 6.05 m², so the sub-base and the labour are not free; the slabs and the saw are.

Two Plan tiles panels for Bluestone 60×60, each beside its base seen from above. Left, a base of 6.05 m²: stack bond 12 whole slabs and 8 cut, the smallest 35.0 cm; half bond 8 whole and 14 cut; half bond along 12 whole and 10 cut, the smallest 5.0 cm. Right, a base of 7.20 m²: stack bond 20 whole slabs, none cut.
Left: 2.20 × 2.75 m, 20 slabs of which 8 are cut. Right: 2.40 × 3.00 m, the same 20 slabs, all whole.

Going down to 1.80 × 2.40 m, three by four, would also be whole slabs, but at 1.80 m it is 7 cm narrower than the shed's timber base, so for this shed the only way to round is up.

What goes on the quote

Put the shed on the base and open Quantities: the covering's area comes straight off its outline, 5.00, 6.05 or 7.20 m², next to the shed itself. Use the area for the sub-base and the labour, and the Plan tiles count for the slabs, so the pallet matches the layout you are going to lay. For the four bases here:

  • 50 cm tiles, 2.00 × 2.50 m: 20 tiles, 0 cuts, 5.00 m².
  • 50 cm tiles, 2.20 × 2.75 m: 30 tiles, 10 cuts, 6.05 m².
  • 60 cm bluestone, 2.20 × 2.75 m: 20 slabs, 8 cuts, 6.05 m².
  • 60 cm bluestone, 2.40 × 3.00 m: 20 slabs, 0 cuts, 7.20 m².

The shed maker's own instructions give the base size they expect; start there and round to the slab you are laying. If the client wants a path or a strip of gravel round the shed as well, draw it in the same plan and it is counted in the same list.

Two views of the shed in the corner of the lawn. On the left it stands on a base of grey 50 cm tiles that shows only as a thin strip round its walls. On the right it stands on a wider base of dark bluestone slabs with a clear margin all round.
Left: 2.00 × 2.50 m in 50 cm tiles, a thin margin. Right: 2.40 × 3.00 m in 60 cm bluestone, room to step round the shed.

Try it

  1. Open your plan and press O for the view from above.
  2. Open Catalog, search for 50×50 or bluestone, pick the slab and drag out a rectangle where the shed goes. Type the size on the bar, for example 200 × 250.
  3. With the covering selected, press Plan tiles. Read the whole and cut count for each layout, then press Lay it on the one you want.
  4. Change the size on the bar to the next multiple of the slab and press Plan tiles again to compare.
  5. Open Catalog, search for shed, and put the Garden Shed on the base. Then open Quantities for the area.

Questions people ask

How many slabs do I need for a shed base?

Divide each side by the slab size and round up, then count the cuts. A 2.00 × 2.50 m base takes 20 slabs of 50 × 50 cm with none cut; a 2.20 × 2.75 m base takes 30, ten of them cut.

What size base for an 8 x 6 shed?

The 6 × 8 ft shed in the example has walls of 1.83 × 2.39 m on a 1.87 × 2.43 m timber base. A base of 2.00 × 2.50 m in 50 cm slabs or 2.40 × 3.00 m in 60 cm slabs takes whole slabs only. Check the size the shed maker gives first.

Should a shed base be bigger than the shed?

At least as big as the shed's own timber base. How much bigger is a choice: a few centimetres keeps the base out of sight, 30 cm gives a strip to step on round the shed. Round it to the slab either way.